Hôtel international — Airport City, Accra
Travaux de fiabilisation de l'eau chaude des étages pour un hôtel international à Airport City — équilibrage de la boucle de circulation et renouvellement des équipements réalisés de nuit, sans mise hors service imprévue d'une seule chambre.
International Hotel — Airport City, Accra
An international hotel in Airport City was fielding guest complaints about slow-arriving hot water on upper floors. The engineering team needed the fault corrected without closing rooms and without works visible to guests.
Plumbers Ghana surveyed the secondary circulation, rebalanced the loop, and renewed the failing plant components — with the disruptive stages executed overnight against the hotel’s occupancy schedule. Delivery temperatures at the furthest outlets were measured and recorded before and after the works, and the results handed to the chief engineer in writing.